Bridge Construction 2006-2007
During the construction of the I-355 extension, we monitored the Blanding’s Turtle populations in the area and responded to calls to relocate turtles that ventured too close to the construction.
– We captured turtles
– Affixed radio-transmitters to 24 turtles
– Tracked daily spring through fall
– 2785 radio-locations
– Turtles moved often
– No quality nesting habitat
– No turtles died during construction
Back to: Pre-construction
Continue to: Post-Construction